BUCHLER BRIDGE
Luxembourg – Grand Duchy of Luxembourg
TECHNICAL SPECIFICATIONS Owner: Gouvernement du Grand-Duché de Luxembourg Gen. Contractor: Félix Giorgetti S.A.R.L. - Cimolai Spa - JV Dimensions: total length 103 mwidth 42 m Description: design and construction of a railway overpass with a mixed steel-concrete structure in the city centre of Luxembourg with railway track crossing. The work is divided into two phases, the first of which has already been completed. Total weight approx 1,200 t.