BRIDGE OVER THE CHIUSELLA
Highway A5 KM 36+487 – 36+779 – Italy
TECHNICAL SPECIFICATIONS Owner: A.T.I.V.A. S.p.A. Gen. Contractor: CO.GE.FA. S.p.A - Cimolai SpA (A.T.I.) Dimensions: length 292 m Description: provide for the construction design, supply and installation of metal decks and secondary structures for the reconstruction of the bridge over the Chiusella stream. For a total weight of the metalwork of about 2,500 t.The bridge is divided into 6 spans of about 50 m that are pre-assembled by bolting and welding activities in the adjacent construction site areas and then lifted in place by means of two 400 t capacity cranes.