CERN NEW GATEWAY
Geneva – Switzerland
TECHNICAL SPECIFICATIONS Owner: CERN Architect: Renzo Piano Building Workshop Gen. Contractor: : Maltauro - Cimolai SpA - JV Dimensions: 1,800 t total weight7,320 m2 of metal cladding2,750 m2 glass facades315 m2 of glass flooring Description: the project consists of three pavilions and two structures made of steelwork and glass in the form of tubes, arranged on either side of one of the arteries connecting Geneva to neighboring France. Completing the work is a steel-glass elevated walkway that allows for the crossing of the road and the streetcar line, as well as the connection between all the units.