Technical specifications
Owner: Consorzio Venezia Nuova
General Contractor: San Nicolò Scarl – Setten Genesio S.p.A.
Description:
These masking structures are designed to improve the architectural appearance of the Venice Lagoon and of the facilities serving the MOSE barrier system. They consist of four independent structures, located respectively on the north and south abutments of the Lido San Nicolò inlet and on the east and west abutments of the Lido Treporti inlet. Galvanised and painted S355 steel structures will be supplied and installed, onto which ceramic masking tiles will be laid.

