CDG EXPRESS – Zone C – Porte de la Chapelle

CDG EXPRESS – Zone C – Porte de la Chapelle – Cimolai
Indice

Information

Location

Paris, Île-de-France France

Year

2025

TECHNICAL SPECIFICATIONS 

Owner: SNCF Résau 

Gen. Contractor: Chantiers Modernes Construction 

Dimensions: length: 296 mwidth: 8.6 m 

Description: lower level railway bridge with heavy steel painted structure about 2.500 t. to be installed with the double tip launching method, one straight and one with two curved radii.

Projects

Latest Realizations