TECHNICAL SPECIFICATIONS
Owner: Grant Thornton
Architect: Shay Cleary Architects – MCA Architects
Gen. Contractor: Bennett Construction
Description:six large steel columns and three reinforced concrete cores support the 17 floors of the building, which has an imposing exoskeleton trellised onto its two longest walls. Cimolai has been awarded the supply and assembly of all the metal carpentry, also developing a significant part of the structural planning as well as the entire assembly project.