Technical specifications
Owner: JFJV – JGC Fluor BC LNG Joint Venture
General Contractor: Baker Hughes Company
Description:
As part of the design of the LNG Canada terminal, Cimolai signed the contract for the construction of four steel modules in S355ML and S460ML, with dimensions of approximately 54 m × 22 m × H 25 m. The modules are complete with cladding structures, piping and electro-instrumental supports, and tertiary structures, including ladders, parapets, gratings and marine ladders.




