TECHNICAL SPECIFICATIONS
Owner: DRIEA ILE-DE-FRANCE
Gen. Contractor: Chantiers Modernes Construction
Dimensions: length: 186mwidth: 10.4m
Description: the road bridge will have a self-patinated steel structure of about 825 tons. It will be installed by means of the double tip launching method, one straight and one curved.

