Technical specifications
Owner: CERN
General Contractor: Cimolai S.p.A. (leader), Esa Electromech S.r.l. (JV)
Description:
Design and construction of a 15.7 m × 24.5 m building intended to house the new Control Room at CERN’s LHC-P5 site, where one of the most important experiments currently underway in elementary particle research is taking place.
Cimolai designed and built the civil works, the steel load-bearing structure, the exterior cladding and the interior partitions of the building, as well as supplying and installing the systems.

